Route survey, preparation of conceptual and detailed designs, engineering/shop drawings for construction, technical assistance in sourcing and procurement, supply of materials, onsite installation, pre commissioning tests, High Voltage Resonance Frequency Test, Partial Discharges test, location and repairing of faults on cable & sheath including identifying the causes and all civil reinstatement works for the entire range of high voltage cables from 11kV to 400kV Level
PROJECTS

Power Links Contracting Co Ltd (PLCC), with their quality of work and cost-effective services, has earned the reputation and good-will of their esteemed Clients, who in turn have reciprocated with continued association of PLCC in their various projects.

Especially in the field of High Voltage System Cable Testing and Jointing / Termination services, PLCC has extensively worked with almost all SEC approved contractors in Saudi Arabia. This can be noted from the trends shown here; as well as from the client references in services page.

List of Projects executed by PLCC


Laying Projects - PLCC
Testing Projects - PLCC
Jointing Projects - PLCC